Abbreviations
beg beginning
cdd Slip next 2 sts together to right needle as if to knit; knit the following st; pass the 2 slipped stitches over the knit stitch and off the right needle.
dec decrease by working 2 stitches tog
inc increase by working into front and back of stitch
K knit
K2tog knit 2 together
P Purl
St stitch
Sl Slip
Yf yarn forward
T3F (Twist 3 front) slip next 2 sts onto cable needle and hold at front of work, purl next st from left hand needle then knit sts from cable needle
T3B (Twist 3 back) slip next st onto cable needle and hold at back of work, knit next 2 sts from left hand needle, then purl st from cable needle
C4F (Cable 4 front) slip next 2 sts onto cable needle and hold at front of work, knit next 2 sts on left hand needle, then knit sts from cable needle
C4B (Cable 4 back) slip next 2 sts onto cable needle and hold at back of work, knit next 2 sts on left hand needle, then knit sts from cable needle
C5B (Cross 5 back) slip next 3 sts onto cable needle and hold at back of work, knit next 2 sts on left hand needle, slip the purl st from the point of the cable needle back onto the left hand needle, purl this st, then knit 2 from cable needle
cdd Slip next 2 sts together to right needle as if to knit; knit the following st; pass the 2 slipped stitches over the knit stitch and off the right needle.
dec decrease by working 2 stitches tog
inc increase by working into front and back of stitch
K knit
K2tog knit 2 together
P Purl
St stitch
Sl Slip
Yf yarn forward
T3F (Twist 3 front) slip next 2 sts onto cable needle and hold at front of work, purl next st from left hand needle then knit sts from cable needle
T3B (Twist 3 back) slip next st onto cable needle and hold at back of work, knit next 2 sts from left hand needle, then purl st from cable needle
C4F (Cable 4 front) slip next 2 sts onto cable needle and hold at front of work, knit next 2 sts on left hand needle, then knit sts from cable needle
C4B (Cable 4 back) slip next 2 sts onto cable needle and hold at back of work, knit next 2 sts on left hand needle, then knit sts from cable needle
C5B (Cross 5 back) slip next 3 sts onto cable needle and hold at back of work, knit next 2 sts on left hand needle, slip the purl st from the point of the cable needle back onto the left hand needle, purl this st, then knit 2 from cable needle